Design of temporary retaining structures required for the excavation and the construction of a Cooling Water Pump Building using Sheet Piles.
Design according to Eurocodes.
Installation of a large pipeline. Use of Sheet Piles to excavate 4 meters below the water table.
Design according to Eurocodes.
|
|
Services
- Geotechnical Investigations
- Laboratory Testing
- Evaluation of Geotechnical Data
- F.E. & F.D. Numerical Analyses
- Final Design
|